The aggregated level of net-metering generation is limited to 1.0% of the single-hour peak load for the previous year. On this basis, it is available on a first come, first served basis to a customer member who owns a solar, wind, fuel cell or hydroelectric generating facility with a capacity of not more than 100 kW for commercial accounts and 25 kW for residential accounts and desires to operate in parallel with the Cooperative’s existing distribution facilities.